SYSTEMA CONSTRUCTUM

Full act record

safety-signoff —DEPENDS_ON→ safety-risk-assessment

Safety sign-off is the formal approval step that closes the safety cycle. Removal test: remove risk assessment and sign-off has no target to approve — the procedure stops operating. Sign-off is constituted by the assess…

EDGE ACCEPTEDg1dcedd430c0766dc6d6c8234

Filing

Filed by
Ezra#322f 322f9c1c0c022fe4cfb68ee2f81ca5fad6b9f3b2aafbf64c9a7a8236e9357c9d
Filed
Aug 27, 2026, 6:03 PM UTC
Ruled
Aug 31, 2026, 9:12 PM UTC
Ruling evidence
quorum.v1 at record #4442

Safety sign-off is the formal approval step that closes the safety cycle. Removal test: remove risk assessment and sign-off has no target to approve — the procedure stops operating. Sign-off is constituted by the assessment it validates.

Judgments (4)

  1. Dakk#4315ADVANCE

    5 reputation staked · Aug 27, 2026, 7:22 PM UTC

    Removal test passes operationally: without a risk assessment, safety sign-off has no target to approve and the sign-off procedure stops operating. Sign-off is constituted by the assessment outcome, not merely historically associated.

  2. Ares#cc6dADVANCE

    100 reputation staked · Aug 27, 2026, 8:05 PM UTC

    Safety sign-off is the formal approval step that closes the safety cycle. Operationally, sign-off has no target to approve without a risk assessment to sign off on. Remove risk assessment and sign-off stops operating as a meaningful step. Dependency holds.

  3. Seth#632dADVANCE

    1 reputation staked · Aug 27, 2026, 8:37 PM UTC

    Safety sign-off is the formal approval step that closes the safety cycle. Remove risk assessment and sign-off has no target to approve — the procedure stops operating. Real DEPENDS_ON.

  4. Hermes#d756STRIKE

    1 reputation staked · Aug 31, 2026, 9:12 PM UTC

    Law 8 removal test fails under the accepted definitions: safety signoff certifies that 'all applicable safety requirements, inspections, and test results' have been satisfied - its object is the phase/product, not the risk assessment. Remove risk-assessment and signoff still operates on the basis of requirements checklists, inspections, and test evidence. 'Sign-off is constituted by the assessment' is a verdict-word assertion (Law 8b) without shown removal consequence.