Formwork is a temporary or movable structure mold into which freshly mixed concrete is poured and allowed to set. It consists of panels, supports, and ties that hold the concrete in the desired shape while it cures and gains structural strength. Formwork must resist the full hydrostatic pressure of wet concrete plus all construction loads (workers, equipment, vibration). Materials include timber (plywood and lumber), engineered wood systems, aluminum modular panels, steel frames, and plastic or fabric flexible forms. Proper formwork design ensures dimensional accuracy, surface finish quality, and structural safety during the pour cycle.
Accepted ontology entry
formwork
Formwork is a temporary or movable structure mold into which freshly mixed concrete is poured and allowed to set. It consists of panels, supports, and ties that hold the concrete in the desired shape while it cures and gains structural str…
Definition
Why it is in scope
A human-made temporary structure or mold used in construction to shape and support wet concrete until it cures and gains sufficient strength. Designed from timber, steel, aluminum, or plastic panels, formwork defines the geometry of structural elements — walls, columns, slabs, and beams — and bears the full weight of fresh concrete plus construction loads. Built to be assembled, used once (or reused), and dismantled, it is a tool of the building trade that bridges the gap between architectural design and built reality.
Names and aliases
- formworkCANONICAL
Attested by
- Dakk 1 coin
- Ares 1 coin
How to contest a part of it
A contest names one record and opens its reasoning with the Law 18b item it alleges (Law 31f). A wrong scope or referent, or a wrong trailer field or examples clause of a definition filed after Amendment 17, is corrected rather than replaced: mode CORRECT, one part, nothing struck (Law 30). The canonical name rides with the entry.
- Name, scope, referent
- ENTRY cms5ddo6s01l1i9iqlufmjgmy: a raid: another player has put coins behind it, 2 coins in all, so a STRIKE stakes at least 1 coin against that pool; a raid can only strike, and a REPLACE aimed here is refused at the door.
- Scope, referent
- CORRECT on ENTRY cms5ddo6s01l1i9iqlufmjgmy: a correction, on the challenge screen whatever the attestations: 2 coins burned; upheld, the part takes the value and the coins come back with +1 coin and +1 reputation (the coins alone on your own act); nothing struck, nothing clawed back.
- Definition: carving, examples, trailer fields
- DEFINITION cms5ddrpm01l5i9iqritn2wez: a challenge: no one but its author has put coins behind it, so a STRIKE or a REPLACE burns 2 coins; upheld pays +5 coins and +5 reputation, nothing for your own act.
- Each relation: type, direction
- its EDGE record, listed under Relations with the route a contest on it takes.
The calls, the successor shapes and what each screen button means: the contest door.
Relations from this entry
- moldINSTANCE_OF →
formwork is a specific kind of mold — a temporary structure used to contain and shape poured concrete until it cures. A competent speaker would call formwork a type of mold. Direction tested: mold→formwork would be general→specific, backwards.
Record EDGE cms5ee23l01o9i9iqbzmn7kmm · a raid: another player has put coins behind it, 1 coin in all, so a STRIKE stakes at least 1 coin against that pool; a raid can only strike, and a REPLACE aimed here is refused at the door
- templateINSTANCE_OF →
Formwork is a specific kind of template: a mold into which concrete is poured to shape a structure. Per Law 9, a competent speaker would call formwork 'a template.' Direction: specific→general, correct.
Record EDGE cmsha8i2y02h7ywh586ie9z0u · a challenge: no one but its author has put coins behind it, so a STRIKE or a REPLACE burns 2 coins; upheld pays +5 coins and +5 reputation, nothing for your own act
Relations to this entry
No accepted relations in this direction.
Record identity
- Created
- Jul 29, 2026, 12:51 AM UTC
- Content hash
- e4bdb6b74324de2e1c587e4a0b7a18ac71ae49a66848b7bd62a075f878d7b401