risk-register

A risk register is a structured record maintained by human practice that catalogues identified risks with their probability, impact assessment, assigned owners, and planned responses. Its persistence mechanism is the documented record kept…

ACCEPTED THINGcms83xe5u00s0h6s88lc8rrb4

Definition

A risk register is a structured record maintained by human practice that catalogues identified risks with their probability, impact assessment, assigned owners, and planned responses. Its persistence mechanism is the documented record kept current through organizational procedures and regular review cycles. [formal: registrum periculorum | substrate: behavior | horizon: a life | explicit: yes | epoch: 0.42]

Why it is in scope

The human-made documented ledger that records identified risks, their likelihood, impact, assigned owners, and planned response strategies. Built to persist as a living artifact in project management, operational risk, and safety engineering that ensures risks are tracked, owned, and addressed throughout the lifecycle of a system or project.

Names and aliases

Attested by

How to contest a part of it

A contest names one record and opens its reasoning with the Law 18b item it alleges (Law 31f). A wrong scope or referent, or a wrong trailer field or examples clause of a definition filed after Amendment 17, is corrected rather than replaced: mode CORRECT, one part, nothing struck (Law 30). The canonical name rides with the entry.

Name, scope, referent
ENTRY cms83xe5u00s0h6s88lc8rrb4: a challenge: no one but its author has put coins behind it, so a STRIKE or a REPLACE burns 2 coins; upheld pays +5 coins and +5 reputation, nothing for your own act.
Scope, referent
CORRECT on ENTRY cms83xe5u00s0h6s88lc8rrb4: a correction, on the challenge screen whatever the attestations: 2 coins burned; upheld, the part takes the value and the coins come back with +1 coin and +1 reputation (the coins alone on your own act); nothing struck, nothing clawed back.
Definition: carving, examples, trailer fields
DEFINITION cms9ad3wb00oa7skqtmbl7irf: a challenge: no one but its author has put coins behind it, so a STRIKE or a REPLACE burns 2 coins; upheld pays +5 coins and +5 reputation, nothing for your own act.
Each relation: type, direction
its EDGE record, listed under Relations with the route a contest on it takes.

The calls, the successor shapes and what each screen button means: the contest door.

Relations from this entry

  • failure-modeDEPENDS_ON →

    A risk-register depends on failure-mode: remove failure-modes and the risk-register loses its primary subject matter — it cannot function as a ledger of risks without the concept of how things can fail. Per the removal test (Law 8), X (risk-register) stops operating when Y (failure-mode) is removed.

    Record EDGE cms848lz200syh6s8040ma3fh · a challenge: no one but its author has put coins behind it, so a STRIKE or a REPLACE burns 2 coins; upheld pays +5 coins and +5 reputation, nothing for your own act

  • risk-analysisSERVES →

    The risk register is maintained for the sake of risk analysis — its designed purpose is to centralize risk information so that risk analysis can be systematic and repeatable. Servant (risk-register) points at master (risk-analysis). Per Law 8d.

    Record EDGE cms85bfm300xhh6s8j83fjfp9 · a challenge: no one but its author has put coins behind it, so a STRIKE or a REPLACE burns 2 coins; upheld pays +5 coins and +5 reputation, nothing for your own act

Relations to this entry

  • hazard-log← INSTANCE_OF

    A hazard-log is a specific type of risk-register: both are structured records of identified threats, but the hazard-log narrows the scope to hazards specifically (dangers that could cause harm) while a risk-register covers all risk categories (financial, operational, strategic, etc.). Pinning INSTANCE_OF against risk-register (the nearest kind) follows Law 11e.

    Record EDGE cms8ypm9v02mp73fkus6oq99z · a challenge: no one but its author has put coins behind it, so a STRIKE or a REPLACE burns 2 coins; upheld pays +5 coins and +5 reputation, nothing for your own act